PreSchool
Essex
A Fast, Fully Compliant Solution for a Preschool
The preschool was operating from an existing temporary classroom unit that had become unsuitable for occupation due to issues with the building structure and insufficient insulation. As a result, the preschool children had to be temporarily relocated into the adjacent primary school, creating disruption for both the children and the school community.
With a fully functioning replacement building urgently required, the preschool owner approached Mbloc to provide a solution within a challenging 10 week timeframe. The project required not only the completion of the new building, but also full compliance with Building Regulations and the necessary sign-off before the preschool could return to its own dedicated space.
Delivered in Just 9 Weeks
Through careful planning, efficient project management and Mbloc’s ability to utilise Modern Methods of Construction (MMC), the replacement preschool building was completed and handed over in just 9 weeks - one week ahead of the required 10 week deadline.
The new building was delivered as a fully functioning, high quality preschool facility, providing a safe, comfortable and suitable environment for the children and staff.
Crucially, the building was fully compliant with Building Regulations and successfully signed off, giving them confidence that the new facility met the required standards and was ready for occupation.
The Result
What began as an urgent requirement to replace an unsuitable temporary classroom was transformed into a fully functioning, compliant preschool facility in just 9 weeks.
10 week requirement. 9 week delivery. Fully Building Regulations compliant. Successfully signed off and ready for the children to return.
This project demonstrates Mbloc’s ability to deliver high quality buildings at speed, without compromising on compliance, quality or functionality.
Testimonial - Mbloc go above and beyond
Mbloc and Maple go above and beyond to provide an excellent service. The level of communication was quick, clear and easy to understand by someone completely out of their comfort zone! The detail really was in the planning; from design to preparing the documentation needed so when the construction started there was nothing for me to worry about. The builders were efficient, hardworking, on site early and their work did not interfere with the school’s normal routine. The build was completed within 9 weeks and to a very high standard; with a better structural design and much longer lifespan than other modular buildings. The wooden cladding means it sits well in it’s rural landscape and as it is bespoke it has all the elements we required including a kitchen so the children can bake. Due to the cost we were able to add extras such as an air conditioning unit which has already been a godsend and the company really pulled out all the stops when we discovered we had to be in the building sooner than planned. I cannot thank Mbloc and Maple enough for our beautiful building and I highly recommend them to anyone and everyone.